Employee Dissatisfaction with their Thermal Comfort Conditions
Whiskey Lima was contracted to perform an HVAC Assessment of a new fulfillment center with a history of poor temperature control and employee complaints. Major issues identified included a design flaw resulting in undersized cooling capacity and the lack of Acceptable Thermal Environment (ASHRAE 55-2020) design, policies and procedures
Unresolved Indoor Humidity and Condensation Issues
Whiskey Lima performed a building investigation following months of unresolved humidity, indoor condensation and other issues at a newly constructed fire station. The initial meeting was with architectural, mechanical, test and balance, and other contractors. Following inspection and testing, major issues identified included capacity, ventilation,
Poor Building Envelope
The owner of a rental condominium requested an HVAC assessment after upgrading a split system with one of greater cooling capacity, without noticeable improvement in space conditions. Infrared screening revealed significant heat conduction due to a recent roof replacement, to include skylight installation flaws resulting in 110 degree curb temperature. Infrared photography an
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.